Workspace mfg › work orders
Demo Entity FY 2026 · Apr-Mar · Open
?
Loading...
Tenant Admin
Manufacturing › Production Control

Work Orders

Shop-floor execution · routing, backflushing, and release authorisation
Live shop floor CtrlK
WIP value
₹ 15,13,900
Mat + Lab + OH · backflush-relieved · GL 1340
Released
2
+6 vs yesterday
In-progress
4
46 lines running
On hold
2
QA · material starvation
Completed today
3
Yield 100.0%
13 of 13
WO# Item Qty ordered Qty completed Status Backflush Work-center Std cost Actual cost Var % Due
WO-24871
Hydraulic pump assembly
ASM-9012 · Rev C
120 ea 48
In-progress WC-ASSY-01 700,000 291400.ToString("N0") -58.4% 26 Jul
WO-24872
Spindle housing, 304SS
CNC-3304 · Rev B
80 ea 80
Completed WC-CNC-02 376,000 383000.ToString("N0") +1.9% 25 Jul
WO-24873
Boom weldment, lower
WLD-1188 · Rev A
24 ea 0
Released WC-WELD-03 224,000 18900.ToString("N0") -91.6% 28 Jul
WO-24874
Cabin frame, primed
PNT-7702 · Rev D
32 ea 12
On hold WC-PAINT-04 146,000 66500.ToString("N0") -54.5% 24 Jul
WO-24875
Spare-parts kit, OEM grade
PKG-5510 · Rev F
500 ea 372
In-progress WC-PACK-05 1,050,000 791600.ToString("N0") -24.6% 27 Jul
WO-24876
Final inspection, lot LX-22
INS-2204 · Rev A
200 ea 200
Completed WC-INSP-06 176,000 177300.ToString("N0") +0.7% 25 Jul
WO-24877
Gearbox sub-assembly, M-series
ASM-9018 · Rev B
60 ea 0
Planned WC-ASSY-01 520,000 0.ToString("N0") -100.0% 30 Jul
WO-24878
Flange ring, 8in, SS316
CNC-3308 · Rev A
240 ea 96
In-progress WC-CNC-02 612,000 253900.ToString("N0") -58.5% 26 Jul
WO-24879
Skid base, fabricated
WLD-1191 · Rev C
18 ea 0
Planned WC-WELD-03 150,000 0.ToString("N0") -100.0% 31 Jul
WO-24880
Top-coat, RAL 5012
PNT-7710 · Rev A
40 ea 22
In-progress WC-PAINT-04 100,000 58300.ToString("N0") -41.7% 25 Jul
WO-24881
Export pallet, sea freight
PKG-5512 · Rev B
90 ea 0
Released WC-PACK-05 126,000 9900.ToString("N0") -92.1% 27 Jul
WO-24882
Pressure-test lot, batch L-44
INS-2207 · Rev A
75 ea 0
On hold WC-INSP-06 75,000 23400.ToString("N0") -68.8% 23 Jul
WO-24883
Control panel, IP65, 24VDC
ASM-9020 · Rev A
36 ea 36
Completed WC-ASSY-01 216,000 220000.ToString("N0") +1.9% 25 Jul
Showing 13 of 13 work orders · Total ordered 1,515 units

WO Cost Rollup · Std vs Actual

Aggregated over 13 visible work orders · Material + Labour (setup+run × rate) + Overhead applied · Variance drills to GL voucher (F12)
GL 1340 · WIP inventory
Cost component Standard Actual Variance Var % GL account
Material · backflush + manual issue (261) 3,010,500 1,529,400 -1,481,100 -49.2% 1340-MAT
Labour · setup + run hours × rate 872,700 457,400 -415,300 -47.6% 1340-LAB
Overhead · absorbed by activity type 587,800 307,400 -280,400 -47.7% 1340-OH
Total WIP 4,471,000 2,294,200 -2,176,800 -48.7% 1340
WIP value 1,513,900 posted to GL 1340 on report-as-finished · Variance posted to 5210 (Manufacturing variance).